Greenstone Gold Mine
Geraldton, Ontario
Approximate location

8000 Highway 11For Equinox Gold Corp.
The project
Greenstone Gold Mine is an open-pit gold mine with a processing plant and ancillary facilities in northwestern Ontario, about 4 km south of Geraldton and some 275 km northeast of Thunder Bay, at the intersection of Highway 584 and the Trans-Canada Highway. Wholly owned by Equinox Gold, the mine poured its first gold in May 2024 and reached commercial production in November 2024.
The mine sits on the site of the historic Hardrock, MacLeod-Cockshutt and Mosher underground gold mines, which produced gold from the late 1930s to 1970. Highway 11 was re-routed around the pit during construction. The crushing and grinding circuits have run at the full production rate of 27,000 tonnes per day, and the mine has an initial 15-year life. The work included a two-storey, 34-box camp.
Design Works provided mechanical and electrical engineering.
- 34box camp
- 2storeys
- 23,328sq ft
Gallery
Start anywhere. Think together.
Have a site in mind?
Tell us where it is and what you are planning. The nearest office will pick it up.