Skip to content

Our sectors / Education

Space to learn.
Room to grow.

New schools, additions to buildings that are already full of children, and modular classrooms that arrive in a summer—engineered around the school day.

See how it works
Edmonton, AlbertaSt. Josephine Bakhita Catholic ↗

Education engineering

A school is a small city
that runs on a bell.

Hundreds of people arrive within the same twenty minutes, fill the same rooms, eat at the same hour and leave together—and then the gym and library fill again with a different crowd. A school’s engineering is judged by that rhythm: air that stays fresh when a classroom fills, a gym roof with no columns, power and data where teaching happens, and a building that can take another wing when enrolment grows.

Learning spaces
Classrooms, labs, libraries and shops with fresh air, daylight and power matched to what happens in each room.
Shared spaces
Gyms, commons and kitchens that carry large, short bursts of use, and open to the neighbourhood after hours.
Additions & modular
New space connected to the building that is already there, built in a factory or on site, in stages around the school year.
An existing brick school with a new two-storey classroom addition joined to it by a glazed link.

An addition beside a working school

A school that’s full
can still grow.

Built beside the school day,
connected for the next one.

By winter,
the new classrooms are full.

A day in the school

A school day,
room by room.

Scroll through one day in a typical school, from the first bus to the next September. Watch which rooms light up and what the engineering is doing in each. A conceptual drawing, not any one school’s plans.

  • Fresh air
  • Daylight
  • Power and data

8:15 AM. The building wakes before the children do.

Before the first bus the ventilation has been running, and the rooms have been flushed with outdoor air and brought to temperature. Power and data enter at one service point beside the mechanical and electrical rooms, and the entry vestibule keeps winter out of the front hall.

  • Ventilation before occupancy
  • One service entrance
  • Entry vestibule

St. Josephine Bakhita is a two-storey K–9 school designed for up to 905 students. Design Works provided mechanical and civil engineering and energy modelling. St. Josephine Bakhita Catholic

10:00 AM. A full classroom, and fresh air that keeps up.

A classroom fills and the air has to keep pace. Ventilation follows the room’s occupancy, heat recovery returns warmth from the exhaust to the incoming air, daylight comes in at the window wall and lighting controls take over where it fades. Power and data arrive at the teaching wall.

  • Ventilation by occupancy
  • Heat recovery
  • Daylight and lighting controls
  • Power and data

St. Joseph School in Whitecourt (2017) uses displacement ventilation, hot-water radiant panels, enthalpy wheels and core-type heat recovery ventilators, with occupancy controls and demand-controlled ventilation. Design Works provided mechanical engineering. École St. Joseph 4-12 Replacement School

11:15 AM. A whole school in one room.

The gym takes everyone at once and clears again in minutes. That asks for a clear-span roof with no columns on the floor, large volumes of air moved quietly, lighting that serves a game and an assembly equally, and finishes that take a ball.

  • Clear-span roof
  • Large-volume ventilation
  • Lighting and sound
  • Durable finishes

The new David Thompson High School in Leslieville has a larger gymnasium and specialized trades spaces for welding and construction. Design Works provided mechanical engineering. David Thompson High School

12:00 PM. Lunch, and the kitchen is the busiest room.

The commons and kitchen peak for an hour. Cooking exhaust has to be captured and replaced with make-up air, the equipment needs its own power, and the commons ventilation has to follow the crowd in and out.

  • Kitchen exhaust and make-up air
  • Equipment power
  • Ventilation that follows the crowd

Charlotte Small Elementary in Condor has classrooms, a gymnasium, a library and multi-purpose spaces. Community fundraising and Clearwater County paid for a larger kitchen. Design Works provided mechanical engineering. Charlotte Small Elementary School

6:30 PM. After the last bell, the school is the neighbourhood’s.

The gym and library are booked by leagues, clubs and homework groups while the classroom wing is locked. Zoned controls and separate schedules keep the open rooms comfortable and the empty wing set back, and a dedicated entry keeps the community where it belongs.

  • A separate entry and a secured wing
  • Zoned heating, cooling and lighting
  • Schedules by room

July. The addition arrives.

Summer is when the building changes. Modular classrooms are built off site, set on piers and tied into the existing school: a link to the corridor, the heating and ventilation, the electrical service and data, and the grading around them. In Yellowknife, five 24 ft × 50 ft classroom units were designed for off-site fabrication and quick installation, and can be moved as needs change.

  • Piers and foundations
  • Link to the existing corridor
  • Services tied in
  • Site grading

At St. John Paul II School in Grande Prairie, Design Works designed and integrated six modular classroom units into the existing site, with a new gym, planned to cause minimal disruption to daily operations. St. John Paul II School

8:15 AM. Next September, with room to grow.

What makes an addition easy is decided early: spare capacity in the panel and the plant, a site with room to build and a structure that can be extended. The additions we have designed run from a 1,800 sq ft extension at Doe River Colony School to a 3,500 sq ft addition at Buffalo Head Prairie and full blocks of modular classrooms.

  • Spare electrical and mechanical capacity
  • Service stubs at the edge of the site
  • A structure that can extend

A 3,500 sq ft addition to an existing school about 20 km south of La Crete, designed to integrate with the existing building. Design Works provided mechanical and electrical engineering. Buffalo Head Mennonite School

The thinking behind the work

The building hands
children a day.

Why we do it. How we approach it. What we bring to a school.

Why

Because children learn in the building we hand over.

Students and teachers spend their days in these rooms. Fresh air, daylight, quiet and systems that simply work are part of the school’s daily job, and the facilities team inherits whatever we leave them.

How

By designing around the school day and the school year.

We map where the rooms fill, when and for whom, then size the air, power and structure for those peaks. Additions are planned around the calendar and the building that already stands.

What

From a new school to the next classroom.

Mechanical and electrical design, energy modelling, civil and site servicing, structural design for additions and gyms, modular design coordinated with the manufacturer, and support through construction.

Who we work with

The board decides.
A team delivers.

Schools are commissioned by school authorities and the province, designed with architects and built by contractors who often return to the same site. We work with all of them.

Clients on these projects

  • Aman Builders
  • Alberta Infrastructure
  • Grande Prairie Catholic School Board
  • Modus Structures
  • The Workun Garrick Partnership

School authorities & owners

Accommodation plans, operating priorities and planned growth turned into clear decisions about the site and the building systems.

Architects & education planners

Learning spaces, circulation and shared rooms coordinated with structure, ventilation, lighting and service routes.

General contractors & modular manufacturers

Clear interfaces between factory and site, and coordinated documents for the people who build the school.

Facilities teams

Systems that can be understood, reached and maintained, with controls that match how the school is actually scheduled.

Before you appoint us

What a school board
should ask its engineer.

The questions that matter when a school is full, a classroom block is coming and the budget is fixed.

How will the addition connect to what we have?

At St. John Paul II School, six modular classrooms and a new gym were designed with seamless connectivity to the existing school’s infrastructure. We start every addition with the existing drawings and a plan for what to investigate.

St. John Paul II School

Can the work happen beside a working school?

Modular delivery is built for it: classrooms fabricated off site and installed quickly to minimize disruption, as in the five-unit Yellowknife classroom project. The owner and contractor set the access arrangements, and engineering identifies each interface.

NWT Modular Classrooms

Will it be comfortable and cheap to run?

Energy modelling was part of our engineering at St. Josephine Bakhita and at the St. Carlo Acutis Catholic High School, and St. Joseph School’s mechanical design pairs heat recovery with occupancy-based ventilation controls.

St. Josephine Bakhita Catholic

What about the site around the new rooms?

Site grading and servicing decide whether a modular addition sits well. At École Leduc Junior High we prepared the site grading drawings for a modular and link addition.

École Leduc Junior High School

Have you worked on northern schools?

Yes: five modular classrooms in Yellowknife, a 3,500 sq ft addition near La Crete and a 1,800 sq ft extension at Doe River Colony School in Saddle Hills County, Alberta.

Buffalo Head Mennonite School

Have you engineered school gyms?

Yes. A new gym at St. John Paul II School (electrical, mechanical and structural engineering) and the larger gymnasium at David Thompson High School in Leslieville (mechanical engineering).

David Thompson High School

School work

New schools.
More classrooms.

Mechanical, electrical, civil and structural work for new schools, additions and modular classrooms across Alberta and the Northwest Territories.

St. Josephine Bakhita Catholic

Edmonton, Alberta

  • Two storeys
  • Up to 905 students
  • Opened September 2025

A two-storey Kindergarten to Grade 9 school for Edmonton Catholic Schools in the Secord neighbourhood of west Edmonton, with bright, flexible learning spaces. Funded by the Government of Alberta; Design Works provided mechanical and civil engineering and energy modelling.

Design Works’ role

Energy Modelling / Mechanical Engineering / Civil Engineering

St. John Paul II School

Grande Prairie, Alberta

  • Six modular classrooms
  • New gym
  • Grande Prairie

A growing school added six modular classroom units and a new gym, designed to connect with the existing school’s infrastructure with minimal disruption to daily operations. Electrical, mechanical and structural engineering with modular design.

Design Works’ role

Electrical Engineering / Mechanical Engineering / Structural Engineering / Modular Design

NWT Modular Classrooms

Yellowknife, Northwest Territories

  • Five 24 × 50 ft units
  • 6,000 sq ft
  • Yellowknife

Five modular classroom units fabricated off site and installed quickly in Yellowknife, with durable materials, efficient mechanical and electrical systems, and the flexibility to adapt or relocate the units. Mechanical, electrical, energy modelling and modular design.

Design Works’ role

Mechanical Engineering / Electrical Engineering / Energy Modelling / Modular Design

More schools, and more rooms.

New buildings, additions and modular classrooms our teams have engineered.

All education projects

The expertise behind it

Mechanical engineering ↗Electrical engineering ↗Modular design ↗Energy modelling ↗Civil engineering ↗

Good questions

What people
ask us first.

Do you work with the school division’s own standards?

Yes. School authorities, Alberta Infrastructure and manufacturers each bring requirements. We review them with the owner and the prime consultant at the start and design to them.

How early should facilities staff be involved?

At the brief stage. Their knowledge of existing systems, controls, maintenance access and the school’s schedule helps test options before decisions are fixed.

Can you design a modular classroom addition?

Yes. We have engineered modular classrooms for schools in Alberta and the Northwest Territories, coordinating the permanent connections, foundations and the split of responsibilities with the manufacturer.

Do you only work on new schools?

No. Our school portfolio includes additions of 1,800 and 3,500 sq ft, a modular and link addition, and a new gym beside an existing school, as well as new K–12 buildings.

Can you model the energy use of a school?

Yes. Energy modelling formed part of our work on St. Josephine Bakhita Catholic and the St. Carlo Acutis Catholic High School in Edmonton.

For engineers & technologists

See yourself in the work?

Meet the team↗Explore careers↗

Your next project / Education

Is your school out of rooms?

Tell us about the site, the calendar and the budget. We’ll bring the engineering.

Let’s talk about it